3mm Society, Railway

Martins Road progress

Had a spare hour tonight so was able to do the second board for Martins Road. Able to lay the point and cut out the space for the sector table.

image

Once this sub board is laid on the ply board the table can be attached and levelled up to the 2 exit tracks.

The second board has had the section removed for where the cassette is to be placed.

image

Here is a photo of the 2 boards together.

image

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.