sed30's Blog

Railways & other things

Eggesford-progress 1

More Eggesford progress

Nicks workshop mutterings

Well the first lot of 14.2 trackwork has been laid. I have used the 3mm Society Finescale track and made up the points on Templot templates with a mixture of society chairs on plastic sleepers (Evergreen strip) and soldered copperclad which will eventually have cosmetic chairs added. I have managed to connect the points up to the existing wire in tube point actuation and re-used the existing wiring so some trains have already been running.

The plan now is to continue to replace the tracK on the scenic boards and then think about the storage yards.

View original post

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: