sed30's Blog

Railways & other things

Building my first etched coach, Comet Models E147

Work is going well with my first etched coach kit, ex GWR ‘E147’.

Strictly speaking, this isn’t a coach that I believe worked on the Bala-Blaenau Branch but it a variety of Non Corridor Brake Composite. The two most common coaches used on the line are not produced in model form, those being the Collett E157 and Hawksworth E167. E147 is quite similar to the E157 plus they did work in Wales, a touch further south (have a look at Mr Geoff Forster’s beautiful Llangunllo layout to see an E147 in it’s natural environment.)

_MG_8355

It is now ready to have the roof glued in place before building up the under frame. I did have a touch of help from Tony Wright on assembling the actual body of the coach, however all the soldering work on the sides was done by yours truly.

Regarding the E157 and E167 that I will be needing…

View original post 37 more words

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: