sed30's Blog

Railways & other things

Another building

Tarring Neville progress

Ouse Valley Modeller

Sorry for the lack of updates lately. Things have slowly been moving along with Tarring Neville though. The larger flint building has been made removable in case any of the point switches need attention and this is now ready to be bedded in. I have also been working on getting another building ready to fit to the layout.

20170228_14391620170228_143927

This one has been lurking around in the background for some time. It is loosely base on the stores building from Hellingly Station and is made up of a foamboard shell with South Eastern Finecast corrugated iron plasticard over it. Windows and guttering came from the bits box and the down pipes were knocked up from some metal rod and split pins. When it came to painting I was originally going to paint the whole thing a cream colour but I had slowly gone off this idea and opted for a blue/grey…

View original post 148 more words

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: