sed30's Blog

Railways & other things

Throwback Thursday , ballasting…

Albion Yard

Remember the good times? Spending hours brushing ballast into the sleepers, getting the point work clean, repainting, filling the gaps afterwards?


No, me neither! However it is one of those chores that for me is included in the ‘Meh!’ files along with wiring. Today I’ve finished all the track work, it’s all had a good shakedown testing so on with the ballast. I’m using Woodland Scenics and it’s now in place for the fixing.


Normally I use diluted PVA or superglue, but this time I’ve tried a different technique, clear varnish acrylic with the surface tension reduced with detergent. It worked ok and I did a traditional PVA/detergent mix test simultaneously.


Working outside on a warm summer day the PVA cured faster, so I reverted to that method for the ballast across the layout. Peco bufferstops are at the track ends, but will be replaced with GWR or LMS/BR types…

View original post 172 more words

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: