sed30's Blog

Railways & other things

Building blocks

Lovely modelling

Ouse Valley Modeller

A milestone has been reached with Tarring Neville as all the buildings are just about finished and I can start thinking about fixing them to the layout. The flint barn has been painted and is just waiting on some details to put inside. I am really pleased how the internal flint wall leading up to the stairs has come out.

IMG_8780IMG_8783

I am thinking of making a couple of the buildings removable. 1. To help with cleaning etc and 2. to stop them getting damaged in transport. The other large flint building has already been made removable so that if any of the point switches need attention I can still get to them. This was glued to a thin ply base and some bolts used to hold it in place. With the other buildings I’m going to look at adding some dowels to act as pins that slot into the baseboard.

View original post

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: