Advertisements

sed30's Blog

Railways & other things

Lananta-January progress

Nicks workshop mutterings

It’s been a while since I reported on the progress of Lananta. I have been concentrating on the scene at the right hand side which includes the bridge over the creek and the now disused lime kilns. The backscene has been painted and installed together with trees and ground works.

Materials are a mix of static grass, dyed hemp and woodlands scenic fine scatters. The seaweed is a course scatter from green scenes. The sand is a mixture of filler mixed with stone dust supplied by Attwood Aggregates and then painted with washes of watercolour. The water is painted with acrylics and then varnished with a quick drying satin varnish.

The sailing boat is an old model built over 20 years ago for another layout. The rowing boat is a resin casting from Quaycraft as described in a previous posting.

A ‘narrow gauge’ Beyer Peacock 0-6-0 goods with a fish…

View original post 15 more words

Advertisements

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: