Advertisements

sed30's Blog

Railways & other things

Preparing ‘First’ for Narrow Gauge South

Steve's 009 and 09 Adventure

My layout ‘First’ will be appearing at Narrow Gauge South at Barton Peveril College on Saturday 7th April. If you are going to NG South please drop by and say ‘Hello’. It’s a small layout in a large exhibition, blink and you’ll miss it 🙂

To prepare the layout and check everything is working well I cleaned the track thoroughly and ran a loco for over an hour. I haven’t used the layout for over 8 months (Gasp!) and it was a real pleasure to run it again.

On the NG Railway Modelling Forum Michael Campbell recommended running a carpenter’s pencil over the rails to create a layer of graphite and improve the electrical connection. It sounded like a good idea. After I’d thoroughly cleaned the track I ran my brand new carpenter’s pencil over the rails. It’s definitely helped the slow running and I’m very intrigued to see how…

View original post 7 more words

Advertisements

Single Post Navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: